Reed Canyon Enhancement Strategy
Implementation Strategy
| Crystal Springs Canyon Management Zone | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Timing of Tasks |
||||||||||||
| Tasks |
J |
F |
M |
A |
M |
J |
J |
A |
S |
O |
N |
D |
|
Restore headwater forest on slopes (approx 300,000 sq ft) |
||||||||||||
|
Hire labor crews to remove in areas with native veg conflicts |
X |
X |
X |
X |
X |
|||||||
|
Coordinate and conduct bi-annual volunteer ivy/ blackberry pull |
X |
X |
X |
X |
||||||||
|
Work with neighbors to remove invasives on their property |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
|
Seed freshly cleared areas with regreen or sterile wheat for ec |
X |
X |
X |
X |
||||||||
|
Monitor and periodically remove new invasive growth |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
|
Revegetate cleared areas with native plant material |
X |
X |
X |
X |
||||||||
|
Coordinate bi-annual volunteer planting day |
X |
X |
||||||||||
|
Enhance lake to stream transition (min 200 lf) |
||||||||||||
|
Develop a detailed design for channel re-design and fish passage |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
|
Secure permit for pipe removal/ channel creation |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
|
Hire contractor to re-create channel / modify passage |
X |
X |
X |
X |
||||||||
|
Use bioengineering to increase vegetation on streambank edge |
X |
X |
||||||||||
|
Add large woody debris to stream channel to improve habitat |
X |
X |
X |
|||||||||
|
Enhance floodplain with riparian edge / forested wetland plant comm. |
X |
X |
X |
X |
||||||||
|
Improve pedestrain access around theater / restore stream channel |
||||||||||||
|
Secure permit for in-water work around theater (with other permit) |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
|
Excavate banks under theater to a saturated level |
X |
X |
X |
|||||||||
|
Install preplanted coir mats of sedges and rushes in excavated areas |
X |
X |
X |
X |
||||||||
|
Install nootka rose to detract access under theater |
X |
X |
X |
X |
||||||||
|
Use bioengineering to increase vegetation along streambank |
X |
X |
||||||||||
|
Trail system |
||||||||||||
|
Survey current and potential future location for trails |
X |
X |
X |
|||||||||
|
Regrade trail to a 3' width, 15' away from water's edge (min 500 ft) |
X |
X |
X |
|||||||||
|
Move trail location to accommodate channel re-creation |
X |
X |
X |
|||||||||
|
Install second bridge across stream d/s of theather |
X |
X |
X |
|||||||||
| I. Strategy - General | index | I. Strategy - LL Management Zone | ||